Project details
Project:
City Bridge Lighting ProjectClient:
San Diego-CoronadoAddress:
matresse, 12Architect:
Mark TwenDesigner:
Mark TwenInstaller:
Mark TwenConsulting:
Mark TwenYear of creation:
2022Product:
NS 10
A Major Milestone
As the Port of San Diego moves forward with its San Diego – Coronado Bay Bridge Lighting Project, the vision for lighting up the San Diego-Coronado Bay Bridge has come more into focus. For one week – Sunday, November 8 to Saturday, November 14 – a portion of the bridge was temporarily illuminated as the Port conducted the first overwater lighting field test. This testing is the next step in studying the vision to create a monumental signature artwork for the region.
As the Port of San Diego moves forward with its San Diego – Coronado Bay Bridge Lighting Project, the vision for lighting up the San Diego-Coronado Bay Bridge has come more into focus. For one week – Sunday, November 8 to Saturday, November 14 – a portion of the bridge was temporarily illuminated as the.
This test is a significant milestone
The week of technical testing was necessary to evaluate the lighting design that had been developed to-date, its technical functionality, and its ability to effectively display the broad range of artistic color lighting as originally envisioned. During the testing, 170 computer-programable color LED luminaires and controllers were temporarily installed, and the project team and design consultants had an opportunity to take measurements, collect data, and identify .
As the Port of San Diego moves forward with its San Diego – Coronado Bay Bridge Lighting Project, the vision for lighting up the San Diego-Coronado Bay Bridge has come more into focus. For one week – Sunday, November 8 to Saturday, November 14 – a portion of the bridge was temporarily illuminated as the.
The week of technical testing
The week of technical testing was necessary to evaluate the lighting design that had been developed to-date, its technical functionality, and its ability to effectively display the broad range of artistic color lighting as originally envisioned. During the testing, 170 computer-programable color LED luminaires and controllers were temporarily installed, and the project team and design consultants had an opportunity to take measurements, collect data, and identify .
As the Port of San Diego moves forward with its San Diego – Coronado Bay Bridge Lighting Project, the vision for lighting up the San Diego-Coronado Bay Bridge has come more into focus. For one week – Sunday, November 8 to Saturday, November 14 – a portion of the bridge was temporarily illuminated as the Port conducted the first overwater lighting field test. This testing is the next step in studying the vision to create a monumental signature artwork for the region.
As the Port of San Diego moves forward with its San Diego – Coronado Bay Bridge Lighting Project, the vision for lighting up the San Diego-Coronado Bay Bridge has come more into focus. For one week – Sunday, November 8 to Saturday, November 14 – a portion of the bridge was temporarily illuminated as the.





